Well, installation of the decking was begun and nearly completed the next day, but we were short a few pieces of decking, so more had to be ordered. Work will start back again today with installation of the decking on the stairs, and hopefully some work on the railings. The decking that was installed was been trimmed along the edge and caps were installed on all sides of the deck where the decking was already installed. They got the stair treads installed today.
Waiting for the trim.
Putting trim around the edges.
Getting the caps on three edges was a bit tedious, but really trims out the planking nicely.
One section of rail and almost all the posts assembled.
Discovered that the directions for assembly the rails can be misleading, I think things have changed and the instructions have not. Also, the same distance measurement in two different places reference off of different points and it is easy to miss. Part 3