Kamis, 21 April 2016

Bathroom Remodel ? A step back

After looking at the medicine cabinets for a while, it was decided that they were too high.  So I pulled them out and am in the process of lowering them 4.5”.  With the SawsAll, I cut the sheetrock down and then cut the framing back 1.5”.  I built a frame to go in the top of the opening and added sheetrock to it.  I have started mudding the patch.  Once that is done, I’ll re-paper and re-install the medicine cabinets and light fixtures.  Then I’ll be back to where I was…

IMG_2776 IMG_2782

IMG_2787

Related Posts by Categories

0 komentar:

Posting Komentar